Zera Projects is delivering the fit-out of an existing industrial unit in O’Connor into a purpose-built food production facility for Coastal Crunch. The scope covers the full fit-out, mechanical design and construct, electrical and hydraulic services, food-grade finishes, and upgrades to the incoming power, water, and trade waste infrastructure.
The production floor includes a prep and assembly kitchen, pot wash, mill room, oven recess, dry store, ambient dispatch, and bulk store. A new steel mezzanine adds office space above. The facility is classified as a Class 8 production building, so fire, hygiene and food safety requirements are built into the fit-out from the start.
Zera is managing the full delivery pathway. Sequencing the infrastructure upgrades against the fit-out works and integrating the client’s production equipment so the facility is ready to run at handover. Cold rooms, refrigeration, and stainless steel are being delivered by Lazco, working alongside Zera’s construction team.
Project awarded; works are commencing, with completion planned for mid-2027.
Location: Hines Road, O’Connor, Western Australia
Client: Coastal Crunch
Capabilities: Design & Construct
Contract Type: Lump Sum
Duration: 6 months
Subcontractor: Lazco – Cold Storage, Refrigeration & Stainless Steel
Credits: ADE Architects, Venueline (kitchen design)