Home » Cold Storage
Zera Projects builds cold storage with thermal integrity, vapour control and frost-protected slabs, to protect product and keep energy costs down.
Many cold storage projects fail because they are built using conventional commercial construction methods. Thermal bridges at structural connections, broken vapour barriers and under-insulated floor slabs lead to condensation, ice build-up, slab heave and high energy bills. These failures often stay hidden until years after handover, when they are expensive and disruptive to fix.
We control the critical interfaces between the slab, the insulated panel system, the roof structure and the refrigeration plant. Every junction is thermally broken, every vapour barrier is continuous, and every penetration is sealed. The result is a facility that holds temperature reliably and runs efficiently.
The cold rooms and refrigeration are delivered in-house by our sister company Lazco. Lazco designs the cold room, and selects, installs, and commissions the refrigeration plant. The trade that decides whether a cold store performs sits inside our own team.
Lazco’s cold room and refrigeration work spans hospitality, food production, education, healthcare and marine defence.
Planning a new cold store or an upgrade? Talk to Zera Projects early, and we’ll help you co-ordinate design, plant and budget before you commit.
Zera Projects starts from how the facility will actually operate. We help clients understand what is viable, where risk sits, and how the project should be structured before construction starts.
Manufacturing, distribution and food service operations each have different drivers. We engage during design to settle temperature requirements, throughput and refrigeration load early. This closes the expectation gap between designer, client and contractor, and supports realistic budgeting before commitment.
Refrigeration plant drives power, structure and plant location. Food safety drives finishes and drainage. Fire engineering drives the envelope. A decision made in isolation in any one of these forces rework in the others. We resolve them together on the drawings, not as separate trade scopes reconciled on site. The ECI advantage means the building shell and the plant that conditions it are designed to work together from day one.
Interfaces between refrigeration, electrical, mechanical, fire and hydraulic trades are resolved before installation. Power upgrades can carry long lead times, so they are identified before they become programme-critical.
Cold storage rarely shuts down for an upgrade. We control staging, shutdowns and planning to protect products and keep operations moving.
Scope is validated before procurement. Programming reflects real site constraints. Envelope specification, refrigeration plant selection and floor system design are confirmed before procurement. Cost and progress are reported clearly throughout delivery.
These approvals run in parallel on different timeframes, and a late decision in one stream can force rework in another. We identify compliance requirements before they are locked into drawings that are expensive to change. Food Standards Code (Standard 3.2.3) and Food Act 2008 (WA) requirements are built into the base design.
Structured inspections and compliance tracking are maintained throughout construction. Refrigeration plant commissioning, temperature monitoring systems and fire safety certification are tracked through structured service records. Handover documentation is complete and organised.
“Working with Zera Projects completely transformed our space. They took our vision and turned it into reality — on time and with exceptional craftsmanship. Their team’s commitment to quality and clear communication made the whole process smooth and stress-free.”
John Doe
Finance Minister
“We were impressed with how Zera handled the complexities of our commercial kitchen redesign. Their attention to detail and proactive approach increased efficiency while maintaining high-end finishes. Highly recommend!”
Paul Walker
Education Minister
“We were impressed with how Zera handled the complexities of our commercial kitchen redesign. Their attention to detail and proactive approach increased efficiency while maintaining high-end finishes. Highly recommend!”
Paul Walker
Education Minister
Our early integration paves the way for a seamless transition from design to construction.
Our expert team coordinates all stakeholders, ensuring harmony and clear communication throughout the project.
Budget planning, review and value engineering strategies.
We uphold the highest standards, ensuring your project meets all compliance and quality benchmarks
We proactively identify and address potential risks prior to construction, keeping your project on a safe and successful path from the start